This project involved installation of a second 375 kW Combined Heat & Power (CHP) Generator to allow the Kishwaukee Water Reclamation District to produce ~130% of its electricity needs via biogas from anaerobic digestion and produce enough thermal energy to heat KWRD’s anaerobic digesters via hot water. The CHP system included a sound enclosure, electrical connections, hot water heat exchanger, and associated hot water distribution system.